The Big Draw

The Big Draw

A collage about the possible developments of the project.

Precedents

Precedents

Site //// Canal

Site //// Canal

Boatyard //// Carpark

Boatyard //// Carpark

Essoldo //// Footpath

Essoldo //// Footpath

Iteration I-IV

Iterations I-IV

Essoldo

Bar/restaurant as an extension to Essoldo

I

Bar/restaurant connected to Essoldo through courtyard

II

Bar/restaurant extension built into Essoldo

III

Bar/restaurant extension connected to Essoldo as an empty shell, only facades

IV

Iteratins V-VIII

Iterations V-VIII

Canal

Re-shaped landscape on both sides of canal with cycle path and footbridge

V

VI

Re-shaped canalside with cycle lane moved to boatyard for length of plaza

VII

Plaza on one canal side with included cycle lane, park on the other 

VIII

Both canal sides re-modeled connected by a footbridge

Final Iteration

Final Iteration

The final iteration has taken the development of all previous iterations into account and the outcome is a rough concept of what in my opinion works out best for the space and its context.

​

The concept supports a new urban design development including and surrounding Stretford Essoldo.

​

The former entertainment center is restored to be an indoor community space, the forgotten canalside is opened up and made accessible space for the community.